Ace SAP C-ARCON-2202 Certification with Actual Questions Oct 31, 2022 Updated
2022 The Most Effective C-ARCON-2202 with 82 Questions Answers
NEW QUESTION 40
Your customer has a signed NDA that is stored within Ariba Contract Management. Now the customer wants to create an agreement for services ... What should the customer do to create the new contract workspace?
- A. Create a sub-agreement
- B. Create a sub-project
- C. Copy the NDA workspace
- D. Create a follow-on project
Answer: B
NEW QUESTION 41
What is SAP Ariba's best practice for contracts documents that contain similar text in the clauses?
- A. Use a condition to insert the right clause intothe document when the workspace is created
- B. Clauses for documents should NOT be changed because they were approved by the legal department
- C. Decide on the best constructed clause and use the other clauses as alternate or fallback clauses
- D. Whenever possible, reword similar clauses to create a standard clause used in multiple agreements
Answer: D
NEW QUESTION 42
Which of the following are attributes of Partial Bookmarking? Note: There are 2 correct answers to this question
- A. All properly entered bookmarks are respected (Missed)
- B. Anycontent that is NOT bookmarked is treated as a separate clause (Missed)
- C. The section GlobalContract bookmark tag is necessary
- D. Section bookmarks are NOT required
Answer: A,B
NEW QUESTION 43
When you perform any legacy load, what is the maximum zip file size?
- A. 500 MB
- B. 100 MB
- C. 50 MB
- D. 300 MB
Answer: B
NEW QUESTION 44
Besides the Effective Date attribute, which other attributes are required when you set up an auto-renewing contract? Note: There are 2 correct answers to this question
- A. Contract type
- B. Renewal term (Missed)
- C. Agreement date
- D. Number of renewals (Missed)
Answer: B,D
NEW QUESTION 45
What benefits doproject groups offer? Note: There are 3 correct answers to this question
- A. Visibility to projects and workspaces when access control is in place (Missed)
- B. Assignment of user permissions that are specific to a single project or workspace (Missed)
- C. Option to add e-mail reviewers to an approval process
- D. Automatic assignment of users to the Team tab of a project or workspace (Missed)
- E. Ability to reuse project groups in any future projects
Answer: A,B,D
NEW QUESTION 46
When you run a report in the background, which of the following options are available in AribaContract Management? Note: There are 3 correct answers to this question
- A. Auto-schedule based on previous criteria (Missed)
- B. List of users to be notified
- C. Number of days to retain data (Missed)
- D. List of external e-mail addresses to be notified (Missed)
- E. Exportable in PDF format
Answer: A,C,D
NEW QUESTION 47
Why do you use Team Member Rules files?
- A. To add site-wide permissions to the team members
- B. To set access rights and permissions for team members who have previously been added to a project
- C. To assign custom groups to project teams based on project metadata
- D. To restrict the approval rules that are assigned to team members at the task level
Answer: B
NEW QUESTION 48
Why would your customer select theinternal contract type? Note: There are 2 correct answers to this question
- A. To sell products to a supplier
- B. To store confidential employee contracts
- C. To provide services from one subsidiary to another (Missed)
- D. To restrict contract visibility between departments (Missed)
Answer: C,D
NEW QUESTION 49
What is SAP Ariba'srecommendation for when to create a sub-agreement to an existing contract? Note: There are 2 correct answers to this question
- A. When you renew a contract
- B. When you add a schedule (Missed)
- C. When you apply changes to the language of acontract document
- D. When you add a statement of work (Missed)
Answer: B,D
NEW QUESTION 50
Which bookmark type includes the paragraph mark?
- A. Clause
- B. Sub-Clause
- C. Sub-Section
- D. Section
Answer: A
NEW QUESTION 51
Which Ariba document do you use to design a future state solution in Ariba Contract Management? Note:
There are 3 correct answers to this question
- A. Business Requirements Workbook
- B. Header Field DataCollection Template (Missed)
- C. Savings Form Data Collection Template
- D. Contracting Process Design Matrix (Missed)
- E. Enablement Workbook (Missed)
Answer: B,D,E
NEW QUESTION 52
What service does the Ariba Deployment Project Manager NOT provide?
- A. 250 legacy load contracts
- B. One analytical report
- C. Electronic signature configuration
- D. Third-partyintegration
Answer: C
NEW QUESTION 53
You are setting up a number of contracts with different suppliers to work ona facilities construction project.
How would you create the new workspaces to link them to each other in the system?
- A. Create sub-agreements
- B. Create follow-on projects
- C. Create a sub-project
- D. Copy the project
Answer: C
NEW QUESTION 54
Your customer has integrated Ariba Contract Management and Ariba Contract Compliance. How do you modify the contract compliance terms?
- A. 1. Create an amendment-type amendment to the contract workspace
2. Update the contract terms
3. Publish the contract workspace - B. 1. Access the published contract request
2. Update the contract request
3. Submit the changes for approval - C. 1. Create a termination-type amendment to the contractworkspace
2. Close the contract terms
3. Create and submit a new contract terms file - D. 1. Create an administrative-type amendment to the contract workspace
2. Update the contract terms
3. Publish the contract workspace
Answer: A
NEW QUESTION 55
Where are styles defined and where is style mapping performed?
- A. Styles are defined in Microsoft Word
Style mapping is applied in Microsoft Word - B. Styles are defined in Ariba Contract Management
Style mapping is applied in Microsoft Word - C. Styles are defined in Ariba Contract Management
Style mapping is applied in Ariba Contract Management - D. Styles are defined in Microsoft Word
Style mapping is applied in Ariba Contract Management
Answer: C
NEW QUESTION 56
What is the correct task status flow for a Review task?
- A. Not started -> Reviewed -> Complete
- B. Not started -> In Review -> Reviewed
- C. Notstarted -> In Process -> Reviewed
- D. Not started -> In Review -> Complete
Answer: B
NEW QUESTION 57
What is the correct flow when the project owner creates a contract compliance in an SAP Ariba system ...
- A. 1. Contract workspace
2. Contract approval and publishing
3. Issue purchase order
4. Contract - B. 1. Contract workspace
2. Contract terms
3. Contract approval and publishing
4. Contract - C. 1. Contract terms
2. Contract approval and publishing
3. Contract - D. 1. Contract workspace
2. Contract approval and publishing
3. Contract terms
4. Contract
Answer: B
NEW QUESTION 58
What document is created when you export a contract workspace to SAP ERP?
- A. Purchase order
- B. Framework agreement
- C. Operational contract
- D. Scheduling agreement
Answer: C
NEW QUESTION 59
Which of the following custom field types are supported? Note: There are 2 correct answers to this question
- A. Flex master data single select (Missed)
- B. URL link
- C. Text multiple select with hierarchical data (Missed)
- D. Filtered data list
Answer: A,C
NEW QUESTION 60
Where can you save modified prepackaged reports? Note: There are 2 correct answers to this question
- A. Dashboard
- B. Personal Workspace (Missed)
- C. Public Reports (Missed)
- D. Public Workspace
Answer: B
NEW QUESTION 61
Which task attributes does your customer need to review while designing the contracting process? Note: There are 3 correct answers to this question
- A. Conditions (Missed)
- B. Task Description (Missed)
- C. Required or Optional (Missed)
- D. Access Control
- E. Task End Dates
Answer: A,B,C
NEW QUESTION 62
What factor determines whether a supplier can respond to a negotiation task by directly accessing the contract workspace?
- A. Supplier user is a contract manager
- B. Supplier user is registered on the Ariba Network
- C. Supplier user is an e-mail reviewer
- D. Supplier user is a member of the supplier's legal team
Answer: B
NEW QUESTION 63
You need to create contract workspaces using the legacy load process. Which CSV file must the customer populate?
- A. ContractTeam.csv
- B. ContractLoad.csv
- C. ContractDocuments.csv
- D. Contracts.csv
Answer: D
NEW QUESTION 64
......
Try Free and Start Using Realistic Verified C-ARCON-2202 Dumps Instantly.: https://www.actualvce.com/SAP/C-ARCON-2202-valid-vce-dumps.html