NEW QUESTION 21
You want to set up a make-to-order planning scenario for a finished material. Some components from the bill of materials (BOM) should be procured per sales order, other components should be procured for various requirements. Fore casting is NOT possible. Which settings do you make to achieve this?
- A. Planning strategy 20 (Make-to-Order) and the corresponding Mixed MRP indicator
- B. Planning strategy 50 (Planning without final assembly) and the corresponding individual Collective Indicator.
- C. Planning strategy 20 (Make-to-Order) and the corresponding individual Collective indicator
- D. Planning strategy 50 (Planning without final assembly) and the corresponding Mixed MRP indicator
Answer: B
NEW QUESTION 22
An issue storage location was NOT found through the work center, bill of material (BOM)item, or material master. Whatdetermines whether the storage location can be derived from the production version?
- A. Plant Data
- B. MRP Controller
- C. MRP Group
- D. MRP Profile
Answer: C
NEW QUESTION 23
Which time elements can be reduced by a reductionstrategy? Note: There are 3 correct answers to this question.
- A. Wait time
- B. Float after production
- C. Goods receipt processing time
- D. Queue time
- E. Move time
Answer: B,D,E
NEW QUESTION 24
The MRP run detected a shortage of a material that you source from an external supplier in full pallets. How can you make sure you will only receive full pallets?
- A. Use the minimum order quantity.
- B. Use the MRP type for vendor managed inventory.
- C. Use the fixed lot size procedure.
- D. Use the reorder point.
Answer: C
NEW QUESTION 25
You want to perform capacity availability checks on your production orders. What must be set for this to occur? Note: Thereare 2 correct answers to this question.
- A. Checking control must have an overall profile assigned in customizing.
- B. Indicator Relevant for finite scheduling must be set.
- C. PRT Availability check must be set.
- D. Checking rule and group must be assigned.
Answer: A,B
NEW QUESTION 26
What are the possible results of a production planning run inAdvanced Planning (PP/OS)? Note: There are 3 correct answers to this question.
- A. Scheduling agreement schedule line
- B. Purchase requisition
- C. Production order
- D. Stock transport order
- E. Planned order
Answer: A,B,E
NEW QUESTION 27
Which time elements does MRP consider in backward scheduling to determine the order dates for components from dependent requirements? Note:There are 2 correct answers to this question.
- A. In-house production time
- B. Total replenishment lead time
- C. Operation duration
- D. Planned delivery time
Answer: A,D
NEW QUESTION 28
For a production version to be valid and consistent what requirements must be fulfilled? Note: There are 3 correct answers to this question.
- A. The assigned routing and bill of materials (BOM) must be valid in the entire validity period.
- B. The assigned routing must NOT have alternative sequences.
- C. Thedeletion flag must NOT be set for the bill of materials (BOM) or the routing.
- D. The lot size range must be within the lot-size range of the assigned routing.
- E. The assigned routing must be a rate routing.
Answer: A,C,D
NEW QUESTION 29
How can you set up the supply source for the SAP Kanban process? Note: There are 3correct answers to this question.
- A. Using quotations for internal and external procurement
- B. Using purchase orders for external procurement
- C. Using run schedule quantities for in-house production
- D. Using stock transfer reservations for stock transfer
- E. Using purchasing costs for automated source prioritization
Answer: B,C,D
NEW QUESTION 30
Mode selection is one of the scheduling options available in Advanced Planning in SAP S/4HANA. When can you use mode selection?
- A. When multiple planned orders exists in one resource
- B. When multiple operations are maintained for one product
- C. When alternate resourcesare used within one operation
- D. When multiple production versions are maintained for one product
Answer: C
NEW QUESTION 31
If the stock level drops below the reorder stock in reorder point planning, what is the system logic to trigger procurement?
- A. Fill up based on the lot size procedure
- B. Fill up to the safety stock level
- C. Fill up to the reorder stock level
- D. Fill up to the maximum stock level
Answer: A
NEW QUESTION 32
Your project team decides to use a make-to-order planning strategy for a strategic material in discretemanufacturing. What is the impact of this decision? Note: There are 3 correct answers to this question.
- A. Sales order-specific planning run is required.
- B. Sales order-specific stock is created
- C. Production orders are created with sales order reference.
- D. Storage location MRP areas are required.
- E. Net requirements calculation is sales order-specific.
Answer: B,C,E
NEW QUESTION 33
You want to triggering-houseproduction of a semi-finished mater al before a sales order for the corresponding finished good is received. Which planning strategy supports the consumption of planned independent requirements for the semi-finished material?
- A. Planning without final assembly (50)
- B. Planning at assembly level (70)
- C. Make-to-order production (20)
- D. Planning with final assembly (40)
Answer: A
NEW QUESTION 34
Which chart types does the tabular planning table provide in SAP S/4HANA? Note: There are 2 correct answers to this question.
- A. Work center capacities chart
- B. Order (pool) chart
- C. Capacity requirements chart
- D. Orders (dispatched) chart
Answer: A,C
NEW QUESTION 35
What is the difference between co-products and by-products?
- A. Only co-products appear in the processor production order settlement rule.
- B. Only co-products are identified by a special item category in the bill of material (BOM).
- C. Only by-products have a zero inventory valuation.
- D. Onlyco-products can be manufactured in isolation from the main product.
Answer: A
NEW QUESTION 36
......
Trend for C-TS422-2020 pdf dumps before actual exam: https://www.actualvce.com/SAP/C-TS422-2020-valid-vce-dumps.html