NEW QUESTION 28
The controlling department requires the production order variances to be settled to profitability analysis.
How can you achieve this? (Choose two.)
- A. Assign an allocation structure to the settlement profile.
- B. Set the To Be Settled in Full indicator in the settlement profile.
- C. Assign a PA transfer structure to the settlement profile.
- D. Set the Variances indicator in the settlement profile.
Answer: C,D
NEW QUESTION 29
Which of the following organizational units are maintained in Management Accounting? (Choose two)
- A. Operating concern
- B. Company code
- C. Functional area
- D. Business area
- E. Controlling area
Answer: A,E
NEW QUESTION 30
Which of the following views and results does costing based CO-PA provide? (Choose two)
- A. Return on investment.
- B. Balance sheet statement.
- C. Periodic accounting.
- D. Cost of sales accounting.
- E. Contribution margin.
Answer: D,E
NEW QUESTION 31
What is the name of the infrastructure that supports core business solutions in four subcomponents including people integration, information integration, process integration, and application platform?
- A. SAP Exchange Infrastructure
- B. SAP NetWeaver
- C. SAP Web AS
- D. SAP Business Process Management
Answer: B
NEW QUESTION 32
How can you achieve periodic controlling when a lot size based production scenario is used by logistics?
(Choose two.)
- A. Adjust the default rule in the default values for the production order type.
- B. Adjust the costing type of the plan costing variant.
- C. Use an internal order in addition to the production order.
- D. Use a product cost collector in addition to the production order.
Answer: A,D
Explanation:
Explanation/Reference:
NEW QUESTION 33
A customer wants to add overhead cost to a material cost estimate with quantity structure, without changing the BOM and routing.
Which options does the customer have? (Choose two.)
- A. Cost element planning
- B. Easy cost planning
- C. Overhead surcharges
- D. Template allocation
Answer: C,D
NEW QUESTION 34
Where do you have to assign the costing sheet to enable overhead surcharging for material costing?
- A. Costing variant
- B. Material cost estimate
- C. Costing version
- D. Material master
Answer: A
NEW QUESTION 35
A customer allocates a variety of cost elements from many cost centers to others by
distribution cycles. The customer complains about the long duration and runtime. What do you recommend to shorten the runtime? (Choose two)
- A. Use assessment instead of distribution.
- B. Use cycle run groups for parallel processing.
- C. Use an allocation structure within the distribution cycles.
- D. Use iteration within the cycles.
Answer: A,B
NEW QUESTION 36
When creating an internal order, which data is derived from the order type? (Choose two)
- A. Settlement profile
- B. Model or reference order default entries
- C. Commitment profile
- D. Settlement rule
Answer: A,B
NEW QUESTION 37
Which of the following needs to be activated in the New GL to implement profit center accounting for all costs and revenues? (Choose two.)
- A. Real-time integration CO/FI
- B. Scenario segment reporting
- C. Scenario profit center update
- D. Document splitting
Answer: A,C
NEW QUESTION 38
What planning options do you have on internal orders? (Choose three.)
- A. Easy cost planning
- B. Activity output planning
- C. Overall planning
- D. Top-down planning for order hierarchies
- E. Unit cost estimate
Answer: A,C,E
NEW QUESTION 39
Where do you determine the price finding strategy for material costing?
- A. Valuation variant
- B. Price determination
- C. Price control
- D. Valuation class
Answer: A
NEW QUESTION 40
What options are provided by SAP Business Warehouse (SAP BW) when creating financial reports?
(Choose two.)
- A. You can convert a Microsoft Excel pivot table query into an SAP BW report.
- B. You can display an analysis on the Web using Enterprise Portal and BEx Web Analyzer.
- C. You can display an analysis in Microsoft Access using the Business Explorer viewer.
- D. You can export a Web report to a BEx Web Analyzer report.
Answer: B,D
NEW QUESTION 41
What can you achieve by using a key figure scheme in drilldown reports in profitability analysis?
- A. You can calculate lines with subtotals in a drilldown report.
- B. You can improve the runtime of the drilldown report.
- C. You can access several databases simultaneously.
- D. You can create summarization levels with predefined key figures.
Answer: A
NEW QUESTION 42
What are the requirements to create primary cost component splits?
- A. All the above
- B. Define a cost component structure for the primary cost component split of product cost planning.
- C. Define a transfer structure for the transfer of cost components in cost centers and Activity-based- costing to the cost components.
- D. Determine the prices through planned price iteration.
- E. Assign a cost component structure in the CO version in cost center and process cost planning.
Answer: A
NEW QUESTION 43
A customer wants to allocate the over absorption/under absorption of cost centers source related to receiver. What is the most accurate allocation rule?
- A. Assessment of posted amounts based on any derivation rule of characteristics.
- B. Assessment of fixed portions based on statistical key figures of the market segment.
- C. Assessment of fixed portions based on any value field of the market segments.
- D. Assessment of posted amounts based on any value field of the market segments.
Answer: D
NEW QUESTION 44
What does the SAP Web AS provide? Please choose the correct answer. Response:
- A. Real-time data exchange with all SAP systems.
- B. Storage of all transactional documents in one single database.
- C. J2EE and ABAP in a single environment.
- D. Master data harmonization cross SAP NetWeaver.
Answer: C
NEW QUESTION 45
Which of the following are characteristics of Master Data? (Choose two)
- A. Cannot be changed after creation.
- B. Is a template for transactional data.
- C. Is used long-term for multiple business processes.
- D. Is typically assigned to organizational levels.
- E. Must be assigned on client level.
Answer: C,D
NEW QUESTION 46
Which of the following are interactive functions available in the SAP List Viewer? (Choose three.)
- A. D Filters
- B. Master data modification
- C. Summation
- D. Sorting
- E. Dual control
Answer: A,C,D
NEW QUESTION 47
In customization for costing based CO-PA we assign costs and revenues to the required value field. Match the following sources of value fields.
1. Cost Estimate i. Fixed Cost of Goods Manufactured.
2. WBS Elements ii. Freight costs.
3. General ledger Posting iii. Research & development costs.
4. Production order iv. Estimated bonuses.
5. Additional costs v. Production Variances.
- A. 1-iv., 2-ii., 3-iii., 4-v., 5-i.
- B. 1-ii., 2-iii., 3-i., 4-v., 5-iv.
- C. 1-v., 2-iii., 3-ii., 4-v., 5-i.
- D. 1-i., 2-iii., 3-ii., 4-v., 5-iv.
Answer: D
NEW QUESTION 48
You want to receive internal activities in the material cost estimate by using a routing. How
do achieve this?
Please choose the correct answer.
Response:
- A. Assign a cost center and its activities to the corresponding work center.
- B. Assign a cost center with category "production" to the routing operation.
- C. Assign a cost element with type 43 (internal activity allocation) to the routing operation.
- D. Assign a cost center and its activities directly to the routing header.
Answer: A
NEW QUESTION 49
Which of the following statements are correct in context of cost center accounting in an organization?
- A. Valuate semi-finished, finished goods realistically.
- B. Revenues can be posted directly to cost center.
- C. Determining the cost incurred within an organization.
- D. Measuring the cost efficiency at various area of organization.
Answer: C
NEW QUESTION 50
Excluding the Continuous improvement phase, how many phases are there in the
Accelerated SAP roadmap? Please choose the correct answer. Response:
- A. 0
- B. 1
- C. 2
- D. 3
Answer: A
NEW QUESTION 51
Your customer requires a new Report Painter report that displays both cost information and statistical key figures.
How can you implement this requirement?
- A. Define two separate reports and combine them
- B. Define two sections in the report.
- C. Define two variants for the report.
- D. Define two horizontal pages in the report.
Answer: B
NEW QUESTION 52
How can you separate vendor payments for construction advances from regular down payments?
- A. Configure a new vendor account group and assign construction advance vendors to it.
- B. Make regular down payments, open them for update, and flag them as down payments.
- C. Create and use a Special General Ledger indicator for construction advances.
- D. Perform a separate payment run for payment of construction advances.
Answer: C
NEW QUESTION 53
......
Brief Details
Following are the quick details related to the SAP Certified Application Associate - Management Accounting with SAP ERP 6.0 EhP7 Certification Exam
Language: English, Japanese, Spanish, German, French, Korean, Portuguese, Russian, Chinese
Exam Code: C_TFIN22_67
Exam Mode: On-line Proctored Exam. Candidates can take the examination from any place any time as per their convenience. SAP also has the option for the candidates to give exams on-site at any of the SAP training center.
Cut Score: 56%
Exam Scores: The score will be notified on-line immediately after finishing the exam. After passing the exam, an SAP Global Certification digital badge will be sent to the registered email ID.
A fully updated 2021 C_TFIN22_67 Exam Dumps exam guide from training expert ActualVCE: https://www.actualvce.com/SAP/C_TFIN22_67-valid-vce-dumps.html